OEM contact
Contact
Share payload, speed profile, protocol, and safety targets. We respond through [email protected].

Send a quick RFQ
Use the form when you want to leave the first technical scope without opening an email client.
Information that speeds up technical feedback
| Input item | Why it matters |
|---|---|
| Payload and duty profile | Defines torque-speed and thermal feasibility early. |
| Wheel and mounting envelope | Prevents mechanical package mismatch during prototype. |
| Protocol and controller context | Clarifies mapping ownership and commissioning workload. |
| Safety/compliance boundary | Aligns STO/SLS and conformity evidence expectations. |
Typical inquiry-to-feedback timeline
| Stage | Buyer action | Factory-side output |
|---|---|---|
| Initial email | Share scope, constraints, and rough timeline. | Acknowledge inquiry and flag missing technical inputs. |
| Technical alignment | Confirm architecture and interface assumptions. | Clarify feasibility boundaries and pilot validation checkpoints. |
| Pilot planning | Lock test priorities and acceptance criteria. | Propose pilot scope and change-control path. |
| Supply handover | Confirm recurring demand scenario. | Define communication rhythm for production-phase support. |
Recommended first email structure
Project type and intended application environment.
Payload, wheel size, target speed, and duty profile.
Controller/protocol assumptions (CANopen, EtherCAT, PROFINET, others).
Safety boundary (for example STO/SLS expectations).
Pilot timing and key decision milestones.
Recommended pre-inquiry reading
Frequently asked questions
What should we include in the first inquiry email?
Include payload range, target speed profile, wheel envelope, control protocol, and any STO/SLS or compliance constraints.
Can we share NDA-sensitive drawings in the first message?
Send high-level requirements first. NDA and detailed file exchange can be arranged during technical alignment.
Do you support pilot builds before recurring orders?
Yes. We support pilot validation and then transition to recurring supply once interfaces and acceptance gates are confirmed.
